Central management unit, Air-Gap firewall, and DHCP server.
1x Mandatory
How many source PCs / servers need to be captured?
How many screens are located in the control room or at operator desks?
Individual power supply units for (vsNEO endpoints + vsNEO-center).
Redundant power supply. Powers up to 12 devices centrally.
Number of devices (vsNEO endpoints + vsNEO-center) powered via an onsite PoE+ switch.
For fiber optic network links.
Provides space for up to 12 vsNEO units. (0 slots free)
Provides space for up to 3 vsNEO units. (0 slots free)
How many vsNEO units will be screwed into the above carriers? (Generates Case-Mount-Sets)
Active ventilation module for fully populated 3RU carriers.
Touchscreen control console (+1 network port per unit).
Enterprise touch panel for desks/racks (+1 network port per unit).
Tactile standard keyboard with programmable additional keys.
Compact console with 15 LCD keys for layout switching.
Required for source PCs with DP output.
For legacy DVI sources or monitors.
Connection between encoder/decoder and target device.
For USB-HID data feedback from host PCs.
Required 1GbE Network Ports
Automatically generated system parts list.
| Qty | Description |
|---|---|
| Enter quantities to generate the Bill of Materials | |